Fact Sheet
Summary of Restructuring Health Services in Brockville


View News Release

Table of Contents
  1. Summary of Total Bed/Service Requirements
  2. Summary of Reinvestments and Savings

1. Summary of Total Bed/Service Requirements

Beds Required for Clinical Services

Bed Category Actual (1995/96) 1997/98 Projected Operating Plan Recommended to 2003

Acute

136 121 92

Acute Mental Health

- - 18

Complex Continuing Care

67 42 57

Rehabilitation

- - 16

Sub-acute

- - 11

TOTAL

203 163 194

ICU Beds (included in acute care number)

6 9 6

Operating Rooms

6 6 4

Redistribution of Clinical Services

Beds Brockville General Hospital
1995/96
St. Vincent de Paul Hospital*
1995/96
Total Total Operating Plan
1997/98
Total Req'd
in 2003

Acute

77

59

136

121

92

Chronic**

67

0

67

42

57

Rehab**

0

0

0

0

16

Acute Mental Health**

0

0

0

0

18

Longer Term Mental Health**

0

0

0

0

0

Sub-acute Beds

N/A

N/A

N/A

N/A

11

Total Beds

144

59

203

163

194

Operating Rooms***

4

2

6

6

4

ICU/CCU****

5

4

9

9

6

* Bed number are based on original constructed capacity.
** Complex continuing, rehab and mental health beds have been calculated using HSRC methodology.
*** In addition to 4 ORs, 2 cystoscopy suites will also be required. Currently present at BGH.
**** There are currently 5 ICU spaces staffed and in operation at BGH compared to 4 ICUs in 1989.

2. Summary of Reinvestments and Savings

Reinvestment Summary

Activity Type
Reinvestment Required
Bed Requirements
Non-Institutional Placements
Low
High

Mental Health*

$1,239,272

$1,239,272

18

-

Sub-Acute Care

$642,000

$790,955

11

-

Complex Continuing Care

N/A

N/A

57

-

Rehabilitation*

$1,745,873

$1,745,873

16

-

Long Term Care

N/A

N/A

0

298

Home Care

$822,170

$822,170

0

-

Information Technology Systems

tbd

tbd

-

-

Total

$4,449,315

$4,598,270

102

298

Notes:
* The reinvestment required for inpatient rehabilitation and mental health services are included in the projection of operating costs for the hospital services
* No additional calculation has been done to provide for ambulatory or community based services.

Summary of Estimated Capital Reinvestment Costs

Category of Cost

General St. Vincent Total
Total Construction

$11,485,055

$4,250,000

$15,735,055

Ancilliary @ 23.2%

$2,664,533

$986,000

$3,650,533

Site Development

$1,500,000

$500,000

$2,000,000

Furnishings/Equip.

$250,000

$100,000

$350,000

TOTAL

$15,899,588

$5,836,000

$21,735,588

Summary of Total Expenses and Savings

 
1995/96 NET EXPENSES*

$34,115,726

 
Clinical Efficiencies

($2,784,030)

 
Program Transfers

($516,909)

 
Support Services Efficiencies

($599,321)

 
Administrative Efficiencies

($1,494,338)

 
Re-allocation of Other Expenses**

$319,432

 
Site Closure

$0

 
Change in Selected Expenses

($114,290)

 

Complex Continuing Care Savings

($89,938)

 

TOTAL SAVINGS

($5,279,394)

15.5%

REVISED EXPENSES

$28,836,332

 
* Net Expenses from OCDM
** Refers to plant costs of chronic care wing.

Back to the top


Back to the English News Releases Menu
Back to the English Main Menu
Go to the French Main Menu